The responsibility for designing, implementing and maintaining a system of internal control lies with: A. the IS auditor. B. management. C. the external auditor. D. the programming staff.

1 6402

The use of statistical sampling procedures helps minimize: A. sampling risk. B. detection risk. C. inherent risk. D. control risk.

1 10872

Detection risk refers to: A. concluding that material errors do not exist, when in fact they do. B. controls that fail to detect an error. C. controls that detect high-risk errors. D. detecting an error but failing to report it.

1 5672

The FIRST step in developing a business continuity plan (BCP) is to: A. classify the importance of systems. B. establish a disaster recovery strategy. C. determine the critical recovery time period. D. perform a risk ranking.

1 8135

Which of the following would be the LEAST helpful in restoring service from an incident currently underway? A. Developing a database repository of past incidents and actions to facilitate future corrective actions B. Declaring the incident, which not only helps to carry out corrective measures, but also improves the awareness level C. Developing a detailed operations plan that outlines specific actions to be taken to recover from an incident D. Establishing multidisciplinary teams consisting of executive management, security staff, information systems staff, legal counsel, public relations, etc., to carry out the response.

2 3485

Which of the following is the MOST reliable sender authentication method? A. Digital signatures B. Asymmetric cryptography C. Digital certificates D. Message authentication code

2 11277

Digital signatures require the: A. signer to have a public key and the receiver to have a private key. B. signer to have a private key and the receiver to have a public key. C. signer and receiver to have a public key. D. signer and receiver to have a private key.

1 3501

The PRIMARY reason for using digital signatures is to ensure data: A. confidentiality. B. integrity. C. availability. D. timeliness.

1 10408

Disaster recovery planning addresses the: A. technological aspect of business continuity planning. B. operational piece of business continuity planning. C. functional aspect of business continuity planning. D. overall coordination of business continuity planning.

1 3492

Which of the following methods of providing telecommunication continuity involves routing traffic through split- or duplicate-cable facilities? A. Diverse routing B. Alternative routing C. Redundancy D. Long haul network diversity

2 7258

The method of routing traffic through split cable facilities or duplicate cable facilities is called: A. alternative routing. B. diverse routing. C. redundancy. D. circular routing.

1 11689

There are several methods of providing telecommunications continuity. The method of routing traffic through split cable or duplicate cable facilities is: A. alternative routing. B. diverse routing. C. long-haul network diversity. D. last mile circuit protection.

1 16016

In a client-server architecture, a domain name service (DNS) is MOST important because it provides the: A. address of the domain server. B. resolution service for the name/address. C. IP addresses for the Internet. D. domain name system.

3 9692

A decision support system (DSS): A. is aimed at solving highly structured problems. B. combines the use of models with nontraditional data access and retrieval functions. C. emphasizes flexibility in the decision making approach of users. D. supports only structured decision-making tasks.

1 4051

To reduce the possibility of losing data during processing, the FIRST point at which control totals should be implemented is: A. during data preparation. B. in transit to the computer. C. between related computer runs. D. during the return of the data to the user department.

2 4874


Post New CISA Certification Questions

Un-Answered Questions { CISA Certification }

WHICH OF THE FOLLOWING IS OFTEN AN ADVANTAGE OF USING PROTOTYPING GOR DYDTEM DVELOPMENT

2826


purchase orders issued to vendors have been authorized as per the authorization matrix

1080