I am applied 100 % pressure on to the air to open control valve,but the valve is not fully closed..and 10-15% is open the valve. how to calibrate the control valve?
OPaL,
3 4307I have a problem with a valve (air to close). When it is fully closed and try to open 1% it doesn't responce till 3% open suddenly more than 3% then back to 3%. I tried to tune positioner then removed it, the problem still exist. Any idea
3 3773dear sir we have insatlled positioner model no.sipart PS2 make Siemens at our control valves . now problem is if we want to increase the response of valve opening speedy /fast. what parameters do we change for positioner ? any idea. please guide us.
CPL,
1894how can i calibrate the temperatuture gauge used by temperature bath(dry block) i mean step by step procedure?
1677Pressure tx shows 1 mbar but we need 1000 mbar at this process condition .. how can we sort it out .
1708Post New Instrumentation Questions
what do u mean by compensation n pid tunning?in pid tunning what you tunned?is it possible 2 tune p i d
What is instrumentation measurement?
How we calculate orifice plat size???
Why plc require in analog input 4-20amp & 0-10 volt?
how radio frequency level probes works with its controller ? what is its principle ? pls give me brief explanation?
protection relay watchdog contact operation?
Specify for Cables - Flame Retardant and Fire Resistant?
Explain bernoulli’s theorem.
what is span value and zero ? and how set ?
How earthing can be checked????
How does a single acting, spring return ball valve actually work? Does it require continuous air supply?
what is the process for double acting cylinder pneumatic for 32' v/v
installation process of orifice,a question asked for confusion creation in interview by BARC 1.if orifice is tightly fitted with pipe ,it will act like venturi 2.if orifice is left hanging in between liquid it will not create the pressure difference exactly,
Can anybody tell me which type of question are asked in the interview for the FORMULATION(Pharma) as a instrumentation engineer, & question in building managment system.
give eg of how I/P is used in control loops