Do you have several alternative BOMs for a material,
depending on the manufacturing procedure or lot size, for
example (multiple BOM)?
Answer Posted / sunil budhwani
yes you can have several alternative BOMs for a material,
only thing is you need to define every BOM with deiffrent
product structure type.
Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
Mention what is the difference between stock transport order and stock transfer order?
Explain the process of Material costing.
You want to integrate pp with fico. What steps would you take?
Overlapping and splitting, where do you assign?
Can't one material be assigned to more than one operation in a routing?
What are the MRP master data?
What are the key fields in MRP views?
what does SAP business workflow do?
What are all the 'sub-components' of production orders?
Can't one material be assigned to more than one operation in a routing, why?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
What is the uses of production scheduling profile and what the configure have you done current project