Answer / rajesh potdar
Header material having alternative component with either
same or differant item data.
Is This Answer Correct ? | 18 Yes | 5 No |
Answer / sonal
One material can have more than one BOMs. When you first create a BOM for a FG it is alternative 1. If you create another BOM for same FG with different components it will be alternative 2.
Is This Answer Correct ? | 3 Yes | 2 No |
Answer / bill fortran
alternative BOM is electronic BOM.
Typically used in critical situations.
Each BOM is like a alternative.
Removing existing data and creating developed 2006n/b1 is
alternative.
Is This Answer Correct ? | 3 Yes | 18 No |
What are the t-codes for creating, changing and summarizing bom?
What is 'work center' in sap pp?
Explain why their is need of production version ?
Can we create production order without bom and routing ?
How to move to the realization phase?
What is the planning horizon?
Do you want to use one BOM to represent several similar materials (closed variant BOM)?
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
What is mean by Standard Value, Scheduling Margin Key, Production Version, Product Cost Collector, Control Key,Demand Management.
what is consignment?
What is MTS and MTO and the difference between them?
Which tool you are using