Answer Posted / bill fortran
alternative BOM is electronic BOM.
Typically used in critical situations.
Each BOM is like a alternative.
Removing existing data and creating developed 2006n/b1 is
alternative.
| Is This Answer Correct ? | 3 Yes | 18 No |
Post New Answer View All Answers
What is meant by payscale structure? How did you configure payscale structure?
Mention what are the production process in sap?
What is mrp controller means?
What do we do in the realization phase?
Where have we to specify the teardown time in one operation?
How to create opbject dependencies in a bom for a configurable material?
What are all the settings done for configuring the integration of pp with fico?
What are sequence, parallel, overlapping, splitting and where can we assign these
What are the types of master views for production and planning?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
What is golive actually? What is the role of a functional consultant in golive actually?
Scheduling times can be defined in the material master record by?
Checkdigit example
How mrp (material requirement planning) types are classified?
How did you configure the payscale structure?