what type of documents needed in every phase of sdlc for
SQA?
Answers were Sorted based on User's Feedback
Answer / praneeth.v
SRS/FRS/BRS , HLD ,LLD , ( Entity Relations )These are the
mandatory docs needed for any project before entering into
proper QA in SDLC.
Correct me if am wrong!
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / padma
Type of documents needed in every phase of the sdlc for SQA are
1.Standards and policy documents explaining the common
standards for each project as per SDLC followed within the
company
2.Procedures and Processes documents explaining how to
maintain the standards within the project development
3.Previous audit reports
For each phase of SDLC,all other corresponding
project-documentation and
4.communication with customers or clients policy documents.
| Is This Answer Correct ? | 0 Yes | 0 No |
if there are 10 step in test cases while executing if their is mismatch at step 5 what is status of test case ? pass or fail or pending or test not complete or else? if require tab is not available then what's the status of test case?
I need to prepare a Test Plan. Any one can provide the a Test Plan model which is sinple so that I can change use it in my company...
what will you do when your reported defect rejected?
An engineering college wants to automate their examination activities to speed up their work and maintain high-end accuracy of information. A brief overview of the proposed system is given below: The proposed examination system is consisting of 8 semesters spread across 9 branches (assume your own branch names) and spans over a period of 4 years. Each student belongs to a branch and must register for a minimum of 6 courses but not exceed 8 courses maximum. The scoring pattern for each course is given as below: Maximum marks for each course: 100 Pass: 35% Distinction: 70% and above First class: =>60% and <70% Second class: >50% and <60% Pass Class: >=35% and <50% The proposed system computes the result and announces the results every semester. The results must be accurate and all examination records will be maintained till the students leave the college. Develop a Test Strategy to test the proposed system. Your Test Strategy must include the following: • Test Plan • Testing Methodology to be followed • Test cases • Test effort estimation • Test Correction Mechanism Note: If you need more information on the requirement specification, you are permitted to assume along the same line but clearly specify the details.
what type of testing process is going on your company?
8 Answers Accenture, CTS, ISPG, Ordain Solutions,
How do we prepare weekly and monthly status-report as QA?
What is Defect/Bug/Error Life Cycle?
Can't we write test plan without any document with us or we definitely require the document for that
If there is any error in RTM. What you will do? Please reply it.
what type of documents needed in every phase of sdlc for SQA?
differentiate test scenario & test case?
17 Answers Talent Sprint, Triniti Advanced Software,
can you plz tell me the all documents to be completed by a manual tester?