Answer / tim
is it COIS or COOIS?.If it is COOIS,then it is for
production order information system.
Is This Answer Correct ? | 15 Yes | 0 No |
Answer / anurudh singh
if this is coois .it is production order information
where we see the consption and production of the FG
materials.
Is This Answer Correct ? | 8 Yes | 0 No |
Answer / jinchandramule
COOIS:Production order information system.
Gives you the Detailed information of the production order
like,
ORD NUMBER,MATERIAL,ORDER TYPE,PLANT,START DATE,ORDER QTY,
ORDER STATUS.
Which is used for the information purpose,in Shop Floor
control.
Is This Answer Correct ? | 6 Yes | 1 No |
Answer / savithri
COIS is a TXN code for modifying the Overall Profile used in
COOIS tcode. We can change the profile with different field
settings.
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / lingaiah
COIS is a Display View "Order Information system: Overall
Profiles".
COOIS: Production order information system
We can see the overall production order under the specific
field values.
COIS is Profile of production order information system
For example Standard Profile "00000000001"
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / rajsh potdar
COOIS is Production order information system.It give the
detail information about production order.We can generate
various production report with help of differant option
given in a List and Layout.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / prabhu
To Maintain "Order Information" Overall profile,like
Standard Profile,Pick List,Collective availability
check,Document Goods Movement,Archiving and Work list per
Work center.
Is This Answer Correct ? | 0 Yes | 0 No |
a company needs 12 standard values. how it can be maintained?
What is testing & explain standard testing
What is known as 'demand management'?
In SAP PP,how do you have relation with end users?
In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?
What are the Important tables in PP, QM?
Tell me important of the Production scheduling profile what are the things have to maintain in this profile
What is the production process in sap?
what is the capacity planner ?
Explain what is the need of mrp list if the stock requirement list is already given?
Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
how many times pcc can run for one material?