How do scheduling the report in BO XIR2? can you say what
are they steps?

Answers were Sorted based on User's Feedback



How do scheduling the report in BO XIR2? can you say what are they steps?..

Answer / v.sivakumar

Scheduling can be done in two areas

1. Infoview (which is explained in the before answer)

2. Through CMC (Central management console)

steps followed
1. Create a calendar according to your requirement.
2.Select the schedule tab in the object which you want to
schedule.
Note: In CMC object referes to report.
3.specify the destination
4.specify the format
5.select the calendar in the scheduling option and lookup
the calendar what you created for this requirements
6.schedule it

for more clarification mail me

Is This Answer Correct ?    12 Yes 1 No

How do scheduling the report in BO XIR2? can you say what are they steps?..

Answer / abhishek

HI all
For sheduling any report open info view as admin
privilage ,then each and every reprot having a sheduling
option which is like a tab in bottom of each report click
on it then there is new window apper fill its all filed
like its sheduling time,its destination folder etc

Is This Answer Correct ?    13 Yes 4 No

How do scheduling the report in BO XIR2? can you say what are they steps?..

Answer / neetu

Scheduling in BO XI R2 cab be done using infoview.Below
mentioned are the steps to follow

1.Open the appropriate folder of the report.
2.Towards the right side of the panel you can see the
reports available.
3.Below the report name "Schedule " option is available
along with History,properties.modify.
4.click on Schedule
5.A new window will pop up
6.Enter the details i.e When,Destination,Format etc.
7.Finally click on Schedule button.

The report will be scheduled

Is This Answer Correct ?    6 Yes 1 No

How do scheduling the report in BO XIR2? can you say what are they steps?..

Answer / arabandisowmya

To Schedule a Web I document:
1. Locate the report you want to schedule.
2. Click schedule under the report link.
3. Select options
1. When
2. Destination
3. Format
4. Caching options(you can export the document as excel,
standard HTML, or PDF)
4. Click Schedule

Is This Answer Correct ?    3 Yes 1 No

How do scheduling the report in BO XIR2? can you say what are they steps?..

Answer / guest

XIR2 scheduling the report using scheduler in
administrator(Supervisor module).

Is This Answer Correct ?    4 Yes 9 No

Post New Answer

More Business Objects Interview Questions

I have one vertical table and in that table there are 10 rows. I want to add one row between 4-5 row. How it possible in WebI.

3 Answers  


can we create aliases for every table beforehand? if yes whar are the disadvantages?

5 Answers   AG Technologies,


what is meant by scorecards?

2 Answers   TCS,


GENARALLY WHAT ARE THE PROBLEMS ARE FACING WHILE CREATING REPORTS?

1 Answers  


Explain what sort of existing documents should business analysts refer to when starting on a new project?

0 Answers  






Hi I'm using data federator.I would like to know if it allows select statment in where clause.For example: SELECT Employee, company, orgunit FROM TAB_BIG WHERE employee IN (Select TAB_SMALL.employee FROM TAB_SMALL WHERE flag = X ) bye

0 Answers  


What is the difference between Sychronisatio and join?

2 Answers   Mind Tree,


what are the complex reports you have created. Tell me with example?

7 Answers   Insurance, TCS,


Difference between b.o 5.1 and 6.1b?

0 Answers  


how can we overcome by loops?and also is it possible ,one user can different universe

4 Answers  


When we can use multiple sql statement for each measure? and multiple sql statement for each context?

2 Answers  


Explain how to execute the plsql procedure from the report by clicking with mouse?

0 Answers  


Categories