How can we shut off the "automatic costing indicator" and
the "automatic scheduling indicator" which go on when the
production order is released?
Answer / guest
For "no automatic costing" follow the IMG path
Production -> Production orders ->Master data -> Order ->
Define order type dependent parameters
Select the order type for which u automatic costing is
not required. In the controlling settings, select "no
automatic costing"
For "no automatic scheduling" , follow the IMG path :
Production ->Operations - >Scheduling -> Define control
parameters
Select the order type and go to details. Deselect "
automatic dates "
Alternatively, you can find indicators in the control
key, which is in the routing. Transaction OPL8 gives you costing
indicators (Order type dependent parameters), and OPJU
(control table for scheduling) gives some scheduling options.
Is This Answer Correct ? | 1 Yes | 2 No |
What is a ‘work center’ in pp?
what is backflush? what are the benefits of back flush?
What do we do in the realization phase?
What are the strategy groups you have used?
What is interaction or interface bet PP with FICO and PP with SD
how do you transfer postings from FI to Co?
What is pi sheet
explain BOM usage and status?
Explain Planning file entry.
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
In implementation stage tell some standard scenario before AS-Is & TO-BE
One component 2 times assign to bom