If informatica has its scheduler why using third party scheduler?
No Answer is Posted For this Question
Be the First to Post Answer
What is informatica? Why do we need it?
What is event and what are the tasks related to it?
What are your source in project and how you import in informatica? How can i explain abt this?
1 Answers Accenture, Unisoft Infotech,
SOURCE 1 a 1 b 1 c 2 a 2 b 2 c TARGET 1 A B C 2 A B C In oracle & informatica level how to achieve
I want my deployment group to refer an external configuration file, while i deploy in the production environment. How can i achieve it.
have you developed documents in your project? and what documents we develop in realtime?
i have f;latfile source. i have two targets t1,t2. i want to load the odd no.of records into t1 and even no.of recordds into t2. what is the procedure and whar t/r's are involved and what is the mapping flow
there is a product table prodid prodname price 100 cinthol 10 101 hamam 10 102 neem 20 103 cake 30 in the above table the price of some products are duplicated and some product prices are distinct we want to push the duplicated prices to one target and non-duplicated prices to other target without using expression and sequence generator transformation
How can we use batches?
What is a filter transformation?
Does Facttable Normalized or Denormalized?
what r the transformations that r not involved in mapplet?