Mention what are the types of master views for production and planning?
No Answer is Posted For this Question
Be the First to Post Answer
Difference between standard cost and variable cost.
Difference between different strategy groups.
1000 pieces you run mrp on that time use md02 or md01
Do you use other validity types (such as serial number, time period, or customer) in addition to the "Valid from" date to control the validity of your BOM changes?
What structure do your BOMs have? How many levels are there? How many components are there on each level?
Explain the stock requirement list and their uses.
Tell some sop
How to attach a drawing for a material to bom ? Is it possible ?
What is scope of planning?
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
You want to integrate pp with fico. What steps would you take?
What is user exist, customer exist, where can be used