Mention what is the purpose of using capacity planning?
No Answer is Posted For this Question
Be the First to Post Answer
What is time phased Planning?
We get an error message "Control parameters for scheduling not defined" while creating test production Orders. Why?
1.what are all the types in backflashing? and T-cde for it 2.what are the different places we can give back flush indicator? 3.what is product cost collector & its t-code? 4.what are all the costs involved in product cost collector 5.how many types of SOP?what is t-code for SOP 6.scheduling parameters for a production orders 7.how do you carry out capacity leveling 8.can you dispatch capacity for a single work center
How to create prt master records?
In realization stage what you will do
Explain what is PRT – how many types of PRT is used?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What is mrp area and mrp group. tell me differences
Explain the process of Material costing.
Different types of consumption based planning.
What is Planning time Fence?
What does a PP Consultant do in his/her real time?