What are the t-codes for creating, changing and summarizing bom?
No Answer is Posted For this Question
Be the First to Post Answer
After doing realization how we will check whether it is working or not?
What happens to plan after it has been converted into production order?
What is MRP Profile and MRP Group?
What are all the 'sub-components' of production orders?
What is collective order. Pre requisite of the collective order?
Explain Flexible Planning procedure or How many levels of Flexible planning.
What is plm (product lifecycle management) in sap pp and what is the use?
i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done
Difference between MTO & MTS
1 Answers Cognizant, UT Pumps,
Explain what is PRT – how many types of PRT is used?
What is mean by Standard Value, Scheduling Margin Key, Production Version, Product Cost Collector, Control Key,Demand Management.
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?