list the important tables used in pp.
No Answer is Posted For this Question
Be the First to Post Answer
Explain the stock requirement list and their uses.
what is group bom? Is it possible to attach the drawing for a material to bom? How?
What are mandatory fields for PP configuration
Define mrp list
What is scheduling
What is the difference between production version & variant configuration?
If I need to maintain a PP module in SAP from the information received from another system, Can i use a table to create the data required for creating the PP
What are the levels of batch, explain batch determination process?
How do I default it 41?
What is collective order. Pre requisite of the collective order?
Mention how mrp (material requirement planning) types are classified?
what are the costing parameter ?