Is it possible to create and schedule a maintenance plan without task list?
No Answer is Posted For this Question
Be the First to Post Answer
How pm module is integrated with mm module?
What is the integration between pm and qm in sap?
You want to control the sap pm order type. How would you do that?
Do we need to run this transaction code ip30 for all the maintenance plans which are scheduled on regularly daily basis or weekly basis so that if any scheduled object exists then it will get converted into the service order ?
Which of the following Master data is relevant for PM ? ( Bill of Material ,Customer Master , Functional Location ,Vendor Master ??)
Explain the use of use of item number in maintenance order?
how to add the counter plan and strategy plan in a single maintenance plan
What do the mb31 tcodes in sap- pm mean?
What is work centre category?
Is it possible to assign a user status to the operation and sub operation of a maintenance order?
I want to learn SAP PM. Can anyone tell me the sequence. I mean the topics in sequence. I have the material
Which work center category is used for plant maintenance work center?