how to add the counter plan and strategy plan in a single
maintenance plan
Answers were Sorted based on User's Feedback
Answer / asheesh aswal
multiple counter plan and stratergy plan cannot be added
together, If u add counter plan with a stratergy, counter
plan will be taken into cosideration ,stratergy will not be
considered.
Is This Answer Correct ? | 27 Yes | 5 No |
What is control key?
What is maintenance plan? Name all types of maintenance plans.
How to configure system to allow notification type change?
We have cost center in main work center as well as in equipment master? What is the purpose of maintaining cost center at both places?
Why do you need an equipment and functional location both?
What are the standard costing variants used for pm orders?
Can we assign one maintenance item to more than one maintenance plan?
I am a beginner in Sap pm.Can anyone suggest me some good website to know more abt sap pm module. If anyone has any material abt it, plz mail to my mail:-satwikghosh@gmail.com
On the notification initial screen we select the notification type using iw21 t code. Is there any t code using which we can skip the initial screen and directly open the notification main screen?
What is difference between activity type and maintenance activity type?
Why cost center field is important in equipment master?
Which order type you use for refurbishment?