What are all the 'sub-components' of production orders?
No Answer is Posted For this Question
Be the First to Post Answer
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
If process order is technically closed, by mistake I want to process that order again can I do it?
What is REM or What is REM profile
What is the internal recruitment?
How you can implement new production order type?
1.what are all the types in backflashing? and T-cde for it 2.what are the different places we can give back flush indicator? 3.what is product cost collector & its t-code? 4.what are all the costs involved in product cost collector 5.how many types of SOP?what is t-code for SOP 6.scheduling parameters for a production orders 7.how do you carry out capacity leveling 8.can you dispatch capacity for a single work center
Explain the stock requirement list and their uses.
Do you use other validity types (such as serial number, time period, or customer) in addition to the "Valid from" date to control the validity of your BOM changes?
One component we can assign to workcenter at routing
What is availability check? How can it be done?
What is Material status and which view of the material master it is available?
How to create prt master records?