How do you get the system to update this value from the routing?
No Answer is Posted For this Question
Be the First to Post Answer
what are Standard keys
what are the settings needed for variant configuration?
You want to insert an inspection check point at the end of an operation. How would you do that?
What is pi sheet
Integration between PP and QM Module.
What is costing? How it is affected the pp?
How to move to the realization phase?
Explain what is routing in sap pp?
what is Standard order type
can any body tell me integration between pp with fi,mm,sd.
What is the t-code for changing production order and to display production order?
What are commmon tickets in SAP PP in support project,examples?