What are the different phases of SDLC ?
Answers were Sorted based on User's Feedback
Answer / ritu
Following are the phases of sdlc:-
1. Preliminary survey
2. Feasibility study
3. System analysis
4. System design
5. Delopment of a software
6. System testing
7. Evaluation & selection
8. post implemetion
9. Maintenanace
these r the phases of system delopment life cycle....
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / pradeep anugu
SDLC Phases:
1. Client Approach
2. Gathering the requirement
3. Analyzing the requirement
4. Designing according to the requirement
5. Code Generation
6. Testing
7. Integration
8. Maintenance
9. User Acceptance Testing
10.Delivery to the client
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / basel al-saaydah
-Planning.
-Analysis.
-Design
-Coding
-Testing
-maintenance
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / chibi
Preliminary/Fesibility Study
Analysis
Design
Development
Implementation
Evaluation or Maintenance
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / usman haruna muhammad
SDLC has five phases namely:
1- Planning phase:-Organization recognizes problems
2- Analysis phase:-project team investigates, understand
problems and solutions requirements.
3- Design phase:-solutions is specified in details
4- Implementation phase:- systems problems that has been
solved is built and installed.
5- Maintainance phase:- system used,maintained and enhanced
to continue to provide intended benefits.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / raheel ahmemon
Planning
Analysis
Design
Development
Intigration & Testing
Implementation
Is This Answer Correct ? | 17 Yes | 17 No |
Answer / anuradha raheja
The different phases of SDLC are:-
1) Requirement Specification
2) Feasilbility Study
3) Analysis
4) Design
5) Testing & Debugging
6) Implementation
7)Post Implmentation and Maintenance
Is This Answer Correct ? | 2 Yes | 2 No |
Answer / anant saraswat
1.problem definition
2.user requirment-analysis
3.system requirment
4.analyseis and design
5.system built/prototype
6.implementation
7.testing
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / kapil madaan
1. Communication (Analysis of Requirement)
2. Planning (scheduling and budgeting)
3. Modeling (Anaylisis and Design)
4. Construction(Coding and Testing)
5. Deployment (Implementation of S/W)
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ritu
SDLC (Software Development Life Cycle) has following seven phases :-
1. Requirement
2. Design
3. Coding
4. Implementation
5. Testing
6. Installation
7. Maintenance
Is This Answer Correct ? | 0 Yes | 0 No |
Did you used crystal reports? Do you have sufficient knowledge on crystal reports?
How do you estimate the effort for your project? Where is the estimation procedure documented?
What is the role of CLR in ASP.NET?
How did you choose the appropriate lifecycle for your project?
Assignment A software house got a project to automate sales/purchase department of a furniture store. The store management is clearly transferred their requirements to the software house management. There is no chance of changing the requirements afterwards. Software house management use waterfall process model to make the project. Given is the progress flow of water-fall process model In waterfall process model, the deliverable (document) produced in one phase serves as an input to the next phase. Suppose you are a project manager who is leading this project. It is decided to work and complete the project using waterfall process model approach. You are required to develop a plan in which the key task is to decide the deliverable that should be built during and after completion of each phase. Also give a description or required contents that must be included in those deliverables. You are not supposed to make the complete project. All you are required to do is to make a Project plan. In that, you need to give a set of deliverables (documents) which according to you, should be developed in each of the phase (Requirements, Designing, implementation, Testing, Maintenance). Also provide contents which should be there in each deliverable. The contents should be clear and have brief explanation. Note:: There are one folder and one file in the attached folder. The file is named as Assignment 4 write-up which is your assignment write-up. The other folder named Project deliverables is the folder in which you are required to organize and place your deliverables. Name of the document/deliverable saved in each folder should be mentioned in the file named checklist (This file is placed in the “Project deliverables” folder) For Example If you produce a deliverable named Requirement Specification (RS) in the “Requirements” phase. You need to do following tasks 1) Finalize the RS contents 2) Save the file in sub-folder named Requirements 3) Write the name of this document in the checklist file under the heading Requirements. Similarly, you need to make and save deliverables of each phase. Not all phases contain one deliverable. There must be some phases having more than one deliverables. PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ? CHECKLIST ARE: 1-Requirements 2- Designing 3- Implementation 4- Testing 5- Maintenance
What are the different inputs and outputs of the phases in SDLC ?
Tell about yourself and job ?
When you come in to the office, how do you know what you have to do during the day?
What procedures do you follow to arrive at the project schedule?
What is the basics of Agile/Scrum development?
Explain the various activities you do (as a PL) when the project is started up.
Write a function that inserts an integer into a linked list in ascending order. Write the test cases for this function.