Which tool you are using
No Answer is Posted For this Question
Be the First to Post Answer
Tell me important of the Production scheduling profile what are the things have to maintain in this profile
What is finite scheduling?
Integration between PP and MM Module.
I have created an order type “ZYC6”, how I know that which types of order it is like process, production or SD order?
What is the use of mrp pp evaluations?
How did you configure the payscale structure?
What general data appears on basic data screen?
1. how Product Cost Collector Works? 2. What are the master data for MRP? 3. In a production order without making goods issue, i should not be able to do goods receipt. How do we do it? 4. i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done. 5. for in-house production, planned order are generated & for external procurement purchase requisition. i want, system will go in external procurement to a particular vendor. what is the setting? 6. what are the problems you faced in MRP?
What are sequence, parallel, overlapping, splitting and where can we assign these
explain BOM usage and status?
what is group bom? Is it possible to attach the drawing for a material to bom? How?
Have you used Pull list or back flushing in REM?