In partical size by malven,which parameter is generlly
change for development of dry and wet method.
Answer / abhishek
In dry method validation of particle size you hve to change parameters like
1) air pressure
2) feed rate
3) measuring time
4) hopper gap(for Malvern 3000)
Is This Answer Correct ? | 2 Yes | 0 No |
in pentoperazole capsules usp why assay value is substract from dissolution
what is the basic principle of conductivity meter
what is method development parameter in HPLC method development
what are risk assement in the analytical qbd?
Why we compare unequal concentrated solutions in heavy metals test. For example comparing the test solution with 1 ppm lead standard and telling it's less than 20ppm?
1 Answers Micro Labs, Mistair,
what is the film thickness in ftir
what is diffrence between specificity and selecivity?
what is the balance drift?
If change in specification which parameter require to do for validation? if change in chromtographic condition then which parameter? if api change then which parameter? if change composition then which parameter? if old method not work out then whicj parameter? if additional one impurity added then which parameter of validation require to do on above each conditions? elaborate separately
what is the lamp used in SOR?
why cone formation during dissolution?
How decided 10 ppm standard solution in Swab, rinse method.?