any deviation can be changed into the change control?
Answers were Sorted based on User's Feedback
Answer / kishor solanke (alkem)
Only planned deviiations are changed into change controls.
| Is This Answer Correct ? | 42 Yes | 4 No |
Answer / rajeswari
when planed deviation is implemented for quality management system then change controls can be raised
| Is This Answer Correct ? | 25 Yes | 3 No |
Answer / mohinder singh
concept has been changed;Now planned devutions are taken under temporary change control and monitor for defined period of time if the change confirms the intended purpose without any failure which were taken under mointioring process' Then temporariry change control converted into permanent change control
| Is This Answer Correct ? | 20 Yes | 0 No |
Answer / deepthi
Yes few deviations can be changedto changecontrol.
| Is This Answer Correct ? | 10 Yes | 2 No |
why we use PG as a taxonomic marker ?
what is difference between method validation and method verification
why doctor prescribe antibiotics for viral infection instead of antiviral drugs?
What is the difference between Analytical method validation and Analytical method transfer?
ONLINE TRAINING IN ORACLE CLINICAL 4.6 (Clinical Data Management) and SAS -SDTM mapping
why you choose pharmacy as a career what is pharmacists ideal job what is your goal in ur profession and how you achieve it
what is the significant achievement in your life
Why we use disodium tartare for determination of factor in karl ficher titration?
What are the stability zones and stability conditions?
How to select HPLC column for particular product.
what type of person need for this company
In dissolution test why sample is withdrawn from top of the paddle and not less than 1 cm away from wall?