explan ur project architecture?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Informatica Interview Questions

How to load a Dimension ? and how to load a fact table?

0 Answers  


Scenario:-  Below is the requirement. Source:-  NAME          ID                    Requirement  RAVI            1                      (no need to repeat as it ID is 1) KUMAR        3                     (repeat 3 times as it ID is 3) John             4                     (repeat 4 times as it ID is 4) Required Out Put:- Name                   ID RAVI                     1                    KUMAR                3      KUMAR                3 KUMAR                3  John                     4 John                     4 John                     4 John                     4 Scenario 2:- Source Data  ID              NAME 1,2            NETEZZA,ORACLE 3,4,5         SQL Server, DB2, Teradata Required Output:-  ID                   NAME 1                  NETEZZA 1                  ORACLE 3                  SQL Server 3                  DB2 3                  Teradata

1 Answers   Cognizant,


The structure of source file is as below: Source structure(two fields) Name, Card NUmber A, 111111111(SSN) A, 01010101(Creditcard number) A, 34343434(Debit card number) B, 55555555(Creditcard number) C, 77777777(Debit card number) Target Structure(4 fields) Name,Credit card,SSN,Debit card A,01010101,111111111, 34343434 B,55555555,, C,,,77777777 Corresponding to one name there can be maximum 3 rows and minimum zero rows. Given that I do not know which record might have a particular type of number. How can I handle above requirement with informatica transformations?

1 Answers   Amdocs,


What is update strategy transform?

0 Answers  


write sql query following source table jan feb mar apr 100 200 300 400 500 600 700 800 900 100 200 300 i want the output format like month total jan 1500 feb 900 mar 1200 apr 1500

3 Answers   Accenture,






what is fact table?

9 Answers  


What is persistent lookup cache?

0 Answers  


generate date / time dimension in informatica

0 Answers   Informatica,


On a day, I load 10 rows in my target and on next day if I get 10 more rows to be added to my target out of which 5 are updated rows how can I send them to target? How can I insert and update the record?

6 Answers  


Can we use procedural logic inside infromatica? If yes how, if now how can we use external procedural logic in informatica?

0 Answers  


Can anyone briefly describe abt audit table loading?

2 Answers   TCS,


SRC1 -> EXP -> AGGR -> TGT SRC2 -> EXP -> Above is a maaping with two pipeline connected to the taret TGT. Design wise is this design is correct or not ?

6 Answers   IBM,


Categories