What does the item category control? How does automatic
account assignment happen?
Answers were Sorted based on User's Feedback
Answer / kishore
Item category controls whether the item is relevant for
pricing, delivery, billing,etc.
Automatic account assignment are basically configured in CO
module.
in case of thirdparty sales account assignment category is
assigned at schedule line category level,in case of make to
order scenario, it is assigned to requirement class..like
that it is assigned to different levels.
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / subha
Kishore
Fristly third party doesnot have schdule lines as there is
no materila movement from your place ( palnt ) to customer
and so no avilability check is done
Secondly the item category controls the condtion type
fallowed for the customer in terms of the material and the
sales area
Automatic assignment happnes based on your condtion type
given in your revenus account which is in turn decided by
your item category and genral item category in the materila
master
Is This Answer Correct ? | 2 Yes | 2 No |
Answer / kishore
Shubha,
The question is talking about the automatic account
assingment.Yes we don't do the scheduling as we don't
deliver the goods to customer, but what about the account
assignment which comes automatically in the purchase
requisition and purchase order?
how does it determines in to PR and PO? it is because we
assign the Purchase requition type,item category and
account assignment in schedule line category.
First of all how the purchase requition is generated once
we save the thirdparty sales order?
it is as following.
First the material master should have the item category
group BANS and that should be assigned with sales document
type and item category TAS.
Secondly we have to assign the MRP type with Schedule line
category. in schedule line category we have to maintaint
the Purchase requisition type, item category,and account
assignment.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sriram
item category controls whether the item is relevant for
pricing,delivery, billing and whether schedule lines are
allowed.
Automatic account assignment is done by FI guy
Is This Answer Correct ? | 0 Yes | 0 No |
1. Item categoty controls what that Item(material) does in
sales order process.
The Item category controls the sales document and
affects the schedule line category .The Item category of
sales order affects the delivery and finally impacts
billing.
2. Valuation class determines g/l a/c to be posted
automatically .In material master we specify valuation
class.The a/c will be updated automatically based on a/c
assignment to valuation class which is specified in MM.
Valuation class is linked to valuation class in T.code-
OBYC.
Is This Answer Correct ? | 0 Yes | 0 No |
Can a sales order have multiple pricing procedure.can each line item have its own different pricing procedure
1 Answers Alstom, Deloitte, SAP Labs, TCS,
hai all, i want to know about CIN, and how it is configured.
What is the purpose of the sales document type?
What is movement type and what are the different types of movement types?
While creating a sales order i va01,if u will give of sales document type and give sales area and press enter. whenthe screen will come with sold to party, if u will not give sole to party ,system will search for what to ful fill that place.
What is agenda of quick off meeting ?
How we can limit the maximum number of line items in Billing document?
What is Baseline and Final Configuration ?
wt are the areas costing @ cost center hits in sd how it happens how to configure
How can we configure that an Invoice is printed and sended immediately to the customer's e-mail account? How to configure this?
7. In real-time project, how many pricing procedures to be used?
hi, i have one problem wen i'm practising...we were creating sales order in std doc type OR. the material has mrp type std ND(noMRP) and item category TAN which was assigned to scheduleline category CN (NO CHECK). wat happened is the system automatically propse the material availability date as 31.12.2008, eventhough i havent configured availability check. so tht i cant make delivery for this order.... i ve tried many time with diff customer...but the same error was happened....can u pls tell me y it is happened?