How to transport release strategy to production environment?
Answers were Sorted based on User's Feedback
Answer / kamal
Only Config can be transported. Masterdata like class and
characteristics cannot be transported.
Is This Answer Correct ? | 25 Yes | 8 No |
Answer / anandan manoharan
Hi All
Release strategy are like master data , which cannot be transport from one client to other , we have to create in each client , else SAP provides an provision through ALE
i.e
BD91 - Distribute All Characteristics via ALE
BD92 - Distribute Classes via ALE : Send Direct
BD93 - Distribution of Classifications Data via ALE
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / venu
First we transport trs...from dev to production system.
In productionsystem create characters and classes.
Assign classes to release strategy by cl24n
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / rupak
Characteristics and class are classification master date it
can't be transport to the production server except all the
data is possible to transfer from server to other.
Is This Answer Correct ? | 3 Yes | 3 No |
Answer / vivek
Through transport request, transfer from dev. To prod through t.Code se10
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / yogesh h
Following points needs to be done in Development system and
transport to Production system
1. Create characteristic
2. Create Class
3. Create release group
4. Create release code
5. Create release indicator
6. Create the release strategy
Master data needs to be maintain in the production.
Is This Answer Correct ? | 9 Yes | 13 No |
Answer / dinesh
Below mentioned steps are used to transport the Release
Strategy into production server.
1. Create/ include the request in Development server.
2. Release the request in Development server by SE10.
3. Transport the request from development server to
production server with the help of SAP - Basis.
Is This Answer Correct ? | 11 Yes | 16 No |
Answer / prapunporn
Release strategy can be configured manually in ERQ
environment. please help to the way to transport to
production.
Is This Answer Correct ? | 2 Yes | 12 No |
If I recieved Change request then how I can Process further this request or how to release the request?
What is an 'mrp list'?
how can configure release strategy so that any thing will be change like one dot text field in po , po become unreleased
what is the transaction code to delete a batch?
How does the system calculate nondeductible taxes?
what is access number in access sequence how do we define that ?
if i am putting the transaction code j1ij it will show the error your not authorise to creat .but in the profile i have given full authorization for my user (sap_all& sap_new) please help me
What is the difference in SAP material management you observed in versions 4.6B and ecc6.0
What is CR (change Request) & how it is working? what are stpes?