How to transport release strategy to production environment?

Answer Posted / yogesh h

Following points needs to be done in Development system and
transport to Production system
1. Create characteristic
2. Create Class
3. Create release group
4. Create release code
5. Create release indicator
6. Create the release strategy

Master data needs to be maintain in the production.

Is This Answer Correct ?    9 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are various stock types?

710


What is the importance of client in sap?

659


How do you post a goods receipt?

605


What is the difference between release procedure with classification and without classification and when they used?

654


What mrp procedures are available in mm-cbp (consumption based planning)?

687






Explain cut-over process in sap mm?

767


what kind of L2 & L3 tickets are in SAP MM. Explain with example. Any enhancement done by you in SAP MM?? please help me in providing some real time examples

1149


What is the differences between release procedure with classification and release procedure without classification? In which business scenario we use them?

693


Differentiate between release procedure with and without classification

666


How is stock transfer from one storage location to another done?

631


Explain the types of consignement stocks in sap mm

661


What unique insight into this upgrade does infotrellis have that other vendors don’t have?

850


What are the main master files used in mm?

717


What business components can mysap erp be classified into?

706


Give some example of master data in material management (mm).

691