How to calculate WIP in PS for all wbs pertaining to that
particular project? Any specific T code in ECC 6.0?
Answers were Sorted based on User's Feedback
Answer / deepa
KKA2 for calculating result Analysis;
KKAJ - for calculating WIP
Is This Answer Correct ? | 16 Yes | 2 No |
Answer / m t haque
KKA2 and KKAJ both do the same thing (RA and WIP calculation terms are used interchangeably) only difference is KKA2 is for individual processing while KKAJ if for collective procesing
Is This Answer Correct ? | 4 Yes | 1 No |
Answer / p.chaithanyavikram
HI All
Through T-code KKA2, Result Analysis we have to calculate the WIP (Work In Progress)
Is This Answer Correct ? | 0 Yes | 0 No |
what mean by valuated stock,non valuated stock?. which cotagiri u r using in po&pr
What is raid as it related to project management?
Where do we define time profiles?
What is the menu path & t. Code for defining special characters for projects?
How are they maitained?
Explain gnatt chart
How can PS be linked to COPA? How will the settlement take place in this case (when PS is linked to Controlling through COPA)
Explain time profiles.
Why does a pm need to be very proactive?
Can you explain project life cycle?
How do you ensure that the project doesn't go over budget?
explain project planning board