What is Retesting

Answers were Sorted based on User's Feedback



What is Retesting..

Answer / ankur

Testing the application across multiple Releases,to make
sure the bug fixes has been done and it does not have any
impact area.

Is This Answer Correct ?    1 Yes 0 No

What is Retesting..

Answer / kunal

Retesting Means, Re-run the testcase after fixing the bug in new build.

Is This Answer Correct ?    1 Yes 0 No

What is Retesting..

Answer / subhashqa

“It is a type of testing in which one will perform a
testing on the some functionality again and again with
multiple sets of values in order to come to a conclusion
whether it is working fine or not.”

1.Re-testing start from first build continues up to the
last build.
2.Regression testing start from second build continuous up
to the last build.
3.During regression testing all re-testing will be
conducted.
4.That is the regions some people never call it as re-
testing and regression testing

Is This Answer Correct ?    0 Yes 0 No

What is Retesting..

Answer / gaurav

it is re-execution of test on same application ,with multiple test data to validate functionality that is re-testing.

Is This Answer Correct ?    0 Yes 0 No

What is Retesting..

Answer / sagarika

after finishing all testcase with bug report if any changes
occur in testing again v r checking all test cases this is
know as retesting

Is This Answer Correct ?    1 Yes 8 No

What is Retesting..

Answer / sagarika

regression testing also know as retesting

Is This Answer Correct ?    2 Yes 33 No

Post New Answer

More Test Documents Reporting Interview Questions

Hello friends.. Can anybody here explain me or provides me notes of these topics in detail with interview questions... Topics are:- History of Software Engineering Waterfall Model Prototype Model Spiral Model Software Quality Testing Software Development Life Cycle Software Testing Life Cycle white box testing methodology black box grey box Definition of Quality,Quality Assurance,Quality Control Verification and Validation Static Testing Dynamic Testing only on my gmail mca.rachna21@gmail.com

1 Answers  


how many levels of regression testing is avilable in our testing process?

10 Answers   Wipro,


HI, TRM(Test Responsibility Matrix) and RTM(requirement Tracebility matrix) both are same??

4 Answers  


plz explane about agile model

7 Answers   GHG, TCS,


differentiate test scenario & test case?

17 Answers   Talent Sprint, Triniti Advanced Software,






An engineering college wants to automate their examination activities to speed up their work and maintain high-end accuracy of information. A brief overview of the proposed system is given below: The proposed examination system is consisting of 8 semesters spread across 9 branches (assume your own branch names) and spans over a period of 4 years. Each student belongs to a branch and must register for a minimum of 6 courses but not exceed 8 courses maximum. The scoring pattern for each course is given as below: Maximum marks for each course: 100 Pass: 35% Distinction: 70% and above First class: =>60% and <70% Second class: >50% and <60% Pass Class: >=35% and <50% The proposed system computes the result and announces the results every semester. The results must be accurate and all examination records will be maintained till the students leave the college. Develop a Test Strategy to test the proposed system. Your Test Strategy must include the following: • Test Plan • Testing Methodology to be followed • Test cases • Test effort estimation • Test Correction Mechanism Note: If you need more information on the requirement specification, you are permitted to assume along the same line but clearly specify the details.

1 Answers   JWC,


What are the contents of Test Plan?

4 Answers  


if there are 10 step in test cases while executing if their is mismatch at step 5 what is status of test case ? pass or fail or anything else? if require tab is not available then what's the status of test case?

2 Answers  


Why I think QA is the positon for me

3 Answers  


How To write Wimax field testing test cases,,,,? both negitive and Positive,,,,follows rule Tringulation (Logitude and latitude)

0 Answers   Ericsson,


I need to prepare a Test Plan. Any one can provide the a Test Plan model which is sinple so that I can change use it in my company...

2 Answers   Global Edge,


what type of testing process is going on your company?

8 Answers   Accenture, CTS, ISPG, Ordain Solutions,


Categories