material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
3250100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
2016I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
2056how sir calculate the slab steel and sir i want to know that how i calculate shutter works payments in cum and the rate is 120 per cum
1 4722Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
1741i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
1870In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
2694plz. how many times required for compacting subbgrade in road way & how many water required?
Sail,
1 4863Post New Civil Engineering Questions
where can i get the previous question papers for rrb section enginerr (civil)
What is bmc stands for in bmc software?
Explain the different types of building contracts?
How many square meter can mason layout chb per hour
What is rate of concrete surface rendering work per sqm
what is Brest Wall?
significance of specific surface area of particles?
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
What things architect have to take care of before starting any project?
explain what do you mean by the property development.
States some of the commonly used commands in cad software’s?
For the construction project what capital cost has to be taken in consideration?
explain the advantages of total stasion
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?