Civil Engineering Interview Questions
Questions Answers Views Company eMail

how to calculate 162/D2 FOR TMT

McNally,

3 9122

How much cement will require for 1Rmt Skirting laying

1855

How many bages of cement used in 1cft?and how we calculat sand and agregats

5 17826

how can calculate qty of steel required for one or two ways slabs..

Proscape LLC,

1 2135

suppose that  156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.

Progressive,

2280

How to calculate stirrups cutting length in columns

Construction,

2 19933

How to calculate the Qty of Mortar in 1 m3 Brick work? Detailed Calculation Required?

4 10138

what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE

3578

What is the outturn of Ceiling plastering

Construction,

2840

How to ascertain the required grade of Steel is good for Site .....

1 3803

What is difference between limit state and working stress method? How it is applies in building structure.

L&T,

2 7144

What is oneside mat. And explain 

2057

what is escalation?how it is done?

Vishal Nirmiti,

2074

 What is difference between limit state and working stress method? How it is applies in building structure.

1738

What is meaning of FREE STANDING STAIRCASE ?

UPCL,

2459


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

How to arrive dry volume of concrete (1.52 to 1.57) ?

1873


what is thumb rule for calculating the size of ISMB required for a particular length of span

2917


what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete

3493


Why should pumping be not used in case of concreting work?

866


material used for mendrel use to bend epoxy coated rebar

1675






how can we construct building without foundation providing only grade beam at ground level

1034


How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?

1456


how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend

1576


what is Short bored pile foundation.

2165


is basic cost of the material includes tax?

1511


What is limit state method and working stress method and ultimate method

1104


Explain what is the release of lien?

628


Which purpose we use deck anchor in bridges?

615


What is the difference between yeild strength and compressive strength of steel???

1758


60-70 grade of Bitumen is VG-30 ?

1639