Post New Civil Engineering Questions
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
How many days should curing of plastering, brick work and concrete
At what point does a circle start losing area when being flattened?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
what is the use in canals of longitudinal drains and cross drains in lining areas?
Explain the different types of roofing systems?
length where bent up is made in slab of bridge from one end
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
What is the force exerted by the tacoma narrows bridge?
why building got air crack? if it get in one particular are what is means?
What is c.g.i sheet which used for roof??
how to shuttering is used in slab