Hi... can anyone send me punjab national bank (Management
Trainee) model paper. My mail-id chithra.sundramurthy@gmail.com
No Answer is Posted For this Question
Be the First to Post Answer
If 5+3+2=151012, 5+4+5=202504, 7+2+5=143542 then 8+6+2= ?
21 Answers DRDO, Facebook, Infosys, intract-crm, Mavensoft, Wipro,
There are 1997 doors in a auditorium and as many as people as the no of doors open enter the auditorium .A door was closed and as many as people as no of doors open leave the auditorium . the process was repeated till the no of doors is equal to1.find the total no of peoples enter the auditorium?
There are two balls touching each other circumferentially. The radius of the big ball is 4 times the diameter of the small ball.The outer small ball rotates in anticlockwise direction circumferentially over the bigger one at the rate of 16 rev/sec. The bigger wheel also rotates anticlockwise at N rev/sec. what is 'N' for the horizontal line from the centre of small wheel always is horizontal.
How much is 3/7 larger than 20 percent of 2
in a class, 20 opted for physics,17for maths,5for both and 10 for other subjects.the class contains how many students ?
the graph was given.the x and y axes were there.the line is intersecting them.the points of intersection were y=3,x=0 and x=-2,y=0.write the equation of line.
5) Write a program that takes a 3 digit number n and finds out whether the number 2^n + 1 is prime, or if it is not prime find out its factors.
give me the pervious years question paper of sbi clerical exam
i am going to write RBI officer b grade exam. can u pls send me past 3 years questions?
Q2. Pipe A takes 16 min to fill a tank. Pipes B and C, whose cross-sectional circumferences are in the ratio 2:3, fill another tank twice as big as the first. If A has a cross-sectional circumference that is one-third of C, how long will it take for B and C to fill the second tank? (Assume the rate at which water flows through a unit cross-sectional area is same for all the three pipes.)
A worker is paid Rs.20/- for a full days work. He works 1,1/3,2/3,1/8.3/4 days in a week. What is the total amount paid for that worker ?
1 Answers 3i Infotech, Canara Bank, Geodesic,
what is difference between abstract class and interface?