Test strategy is a part of test plan.
A test strategy is a test specification which outlines test
objectives provides test cases and scenarios the test data
to be used and expected test results.
A test paln is the approach that will be used to test the
system not the the individual tests.
| Is This Answer Correct ? | 9 Yes | 2 No |
Define what is a critical bug.
can any body tell me vat is the status of the bug when it is going for retesting and where we write the bugs in case of retesting
what are the base line documents for sit and uat? what is impact testing? what is dynamic testing? what is static testing? what is soak testing?
Hi What are the toold used for Manual testing? what are the tools used for defects/bug trackeing in Manual testing? I would appreciate if you can give some examples. Thankyou Sunitha.
What is test methodology?
Hi, I want "Intergraph" placement papers for experienced people which was conducted recently in Hyderabad. Thanks, Purnima.
Q) A hotel telephone sys can perform 3 functions . Call another hotel room by entering a room number(201 to 500) . Call an external line by entering a 9, followed by the number. . call various hotel services 0=operator, 7=room service 8=reception. Write sets of test cases to adequately test this telephone system
What is Client Server/Web Server Configuration(ISS).
what is cyclomatic complexity
What is "V-n-V" Model ? Why is it called as "V"& why not "U" ? Also tell at what Stage Testing should be best to stared?
Hi friends,Am trying on 2+ experience on testing i dont have real time experience. In my resume i mentioned my responsibilties as • Involved in Bug Report Preparation. • Preparation of Test Log. how this two things happens in real time plz answer my question..
1) In a software development project Spiral Model was Chosen as the development model. What is the best-suited reason for this? A)This model is the oldest and most widely used paradigm for software development. B)In this model users get the feel free the actual system and developers get to build something immediately. C)In this model risk analysis is done coupled with evolutionary S/W process model with the iterative nature of prototyping and controlled systematic aspects of water fall model D)This model combines elements of Classical model with this iterative philoophy of prototyping.