When requirement / SRS document comes to a tester then Do
we prepare the test cases +ve & -ve at a time?
Answers were Sorted based on User's Feedback
Answer / alok
Sunitha you are correct.
Srs/Frs cointains all the requirements ao we can write all
possible types of test cases for different scenario.
If need any type of more information mail me
er.qtptester@gmail.com
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / rajendra prasad
U r correct sunitha.
Not only +ve And -ve testcases tester must think about
inmplicit requirements also.
SRS Document defines each and every requirement that client
needs.
Byee
Rajendra
rajendra_penumalli@yahoo.com
| Is This Answer Correct ? | 0 Yes | 1 No |
Hello Above Question is posted by me
AND MY Next Question to above Is :
If we prepare +ve & -ve test cases [Say 1-20]for Version
say 2.0 if tester get the new build with some feature added
to it say 2.1 Now we have to write the test cases for new
build 2.1 [ I mean to say +ve & -ve] then My next test case
id will be 21 onwards BUT I read that +ve test cases should
be executed first .But If I write Test case for 2.1 then my
sequence of +ve first will get disturb. So
PLEASE GIVE PROPER ANSWER TO This Question
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / sunitha
As far as I know,
whenever SRS given to us initially all the possibilities i
mean to say, the test cases regarding all the scenarios
that u think of whether positive or negative should be
written in test case document.
could anybody please correct me if i am going wrong
| Is This Answer Correct ? | 1 Yes | 4 No |
What are the cases why parameterization is necessary when load testing the Web server and the database server?
What are 5 common solutions to software development problems?
what is CMMI and CMM standards and what r software Quality certifications.please explain me clearly
What is difference between individual test team testing and self testing by developer? give pros n cons.
what is advantages and disadvantages of the Waterfall Model and V-Model
5 Answers CSC, SSI Small Scale Industries,
what is SIT? Explain with Example?
What is the role of a bug tracking system?
what is test bed?
what is sequential injection?
can u explain me v-model?I told him we will do parallely both devolpment and testing . frs------------useraccepatance testing \ / srs system testing \ / HLD integration testing \ / LLD--------------------- unit testing \ / CODING he asked me how ur frs is done parallel with useracceptence testing and srs is done parallel to system testing and HLD IS done parallel to integration testing and LLD is done parallel to unit testing.Give me a clear clarification for it?
what is static and dynamic testing.
1 )if you have 1000 test cases ,you find out one defect in second build that time which testing you are using Regression Testing or Retesting ? explain with detail as well as you want to execute all the test cases?