Answer / amrita
Identification Classification Problem Description
Bug ID Status test Case
Test Object Severatity Problem Description
Version Priority comments
Platform Requirement Defect Correction
Reporting Tester Referances
reporting Developer
Reporting Date
| Is This Answer Correct ? | 13 Yes | 5 No |
The format will be like this
1.Defect case id:,Defect description,defect module,defect
type,defect severioty,defect priority
Muralidharan
dharanmu@yahoo.com
| Is This Answer Correct ? | 9 Yes | 2 No |
Answer / gulmohammad khan
Defect ID, Detected by, Detected in Version, Detected on
Date, Priority, Severity, Project, Status, Assign to,
Reproducible, Subject, Description.
| Is This Answer Correct ? | 5 Yes | 0 No |
Defectid| Defect Description |Steps for reproducability |
submitter | Date of Submission | version no | Build no |
Assigned to | Priority | Severity | Status
| Is This Answer Correct ? | 5 Yes | 3 No |
Answer / vishal gupta
An ideal bug report must contain the following fields:
1. Bug ID (Most of the times Auto generated)
2. Severity
3. Status
4. OS (if happening on a particular OS)
5. Platform (If required)
6. Priority (basically a dev field but may be filled by reporter)
7. Assigned to
8. Summary (should contain keywords stating what part of what module the bug is in, should be brief and accurate)
9. Description (should be descriptive and should state all the scenarios with which the bug can be reproduced)
10. Steps to Reproduce (step by step instruction to reproduce the bug)
11. Expected Result
12. Actual Result
13. Attachment (if any)
14 Blocks/Depends on (any other bug being affecting or affected by)
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / ashfaq ali khan
As Per my knowledge, the most common things that has to be
included in the Anatomy of Bug Report are :
Priority
Detailed Description
Impact
Steps to reproduce
Actual result
Expected Result
Attachments If any
Feature or Release needs to be pointed out in it
Need to know whom to assign
Kindly post ur concerns If I had missed anything else.
| Is This Answer Correct ? | 3 Yes | 5 No |
Answer / revathi
Summary: System.NullReferenceException: Object reference
not set
to an instance of an object, while indexing
certain PPT
documents.
Version: 0.0.x
Please describe the problem:
Subscribe to the "Mono Desktop Extensions Snapshots"
red-carpet channel and
install "beagle". Beagle and its dependencies gets
installed. However,
after
installation, running "beagled" gives
"System.DllNotFoundException:
dbus-glib-1"
exception and Beagle daemon stops running.
Steps to reproduce:
1. Install Beagle (from the mdes channel).
2. Setup dbus and launch it.
3. Run "beagled"
Actual results:
Beagle daemon throws "System.DllNotFoundException:
dbus-glib-1" and stops.
Expected results:
Beagle daemon should start running without any exceptions.
Does this happen every time?
Yes
Other information:
I am running NLD. If I install "dbus-devel" package, it
runs properly.
| Is This Answer Correct ? | 2 Yes | 6 No |
Web 2.0 Style Software Testing Management System- any suggestions? I'm looking out for a Web2.0 based software with features which makes test management easy. The feature I expect to see are; dashboards, live updating, reporting and communication system.
where can i can get QTP real time projects and process?
what is test condition
What is the Differnce B/W Quality Management and Quality Control
What do you like about QA?
anyone can explain about SDLC models??
Dear All, Is MBA Graduates Eligible for Software Testing jobs? Thanks Ramesh
A power plant control system?
Software Quality Assurance Progress: Scenario I. Defining SQA milestones II. Assigning SQA resources III. SQA scheduling IV. SQA budgeting V. Selecting software development tools that will interface with the SQA tools VI. Reviewing any contracts with subcontractors for SQA requirements In the above statements, which of the tasks are included in planning the overall SQA effort? Choice 1 I, III, V, and VI Choice 2 I, II, III, and IV Choice 3 I, II, III, and V Choice 4 III, IV, V, and VI Choice 5 II, III, V, and VI
2 Answers Brainbench Certification,
How to create requirements test matrix template?