The size of the bucket is N kb. The bucket fills at the
rate of 0.1 kb per millisecond. A programmer sends a
program to receiver. There it waits for 10 milliseconds /
and response will be back to programmer in 20 millisecond.
How many much time the program takes to get a response back
to programmer, after it is sent?
Plz explain..

Answers were Sorted based on User's Feedback



The size of the bucket is N kb. The bucket fills at the rate of 0.1 kb per millisecond. A programm..

Answer / shaki

30 milliseconds
20+10=30

Is This Answer Correct ?    39 Yes 4 No

The size of the bucket is N kb. The bucket fills at the rate of 0.1 kb per millisecond. A programm..

Answer / l.v.v.ravi kumar

waiting time is : 10 milliseconds
and it'll take to give response for 20 milliseconds.
so the total time taken to get a response back to programmer , after it sent is : 30 milliseconds.

Is This Answer Correct ?    21 Yes 1 No

The size of the bucket is N kb. The bucket fills at the rate of 0.1 kb per millisecond. A programm..

Answer / rahul ubhale

see it doesn't matter that wat the time is being taken to
fill the bucket.
after reaching program it waits there for 10ms
and back to the programmer in 20 ms.

then total time to get the response is

20ms +10 ms=30ms

...it's so simple....

Is This Answer Correct ?    4 Yes 0 No

The size of the bucket is N kb. The bucket fills at the rate of 0.1 kb per millisecond. A programm..

Answer / s.v.kishore

2 milliseconds

Is This Answer Correct ?    6 Yes 10 No

The size of the bucket is N kb. The bucket fills at the rate of 0.1 kb per millisecond. A programm..

Answer / ronak shah

2o mili seconds to reach receiver +
10 mili seconds waiting +
20 mili seconds response

=
50 mili seconds

Is This Answer Correct ?    6 Yes 13 No

Post New Answer

More General Aptitude Interview Questions

cgl2010 tier 2 ki merit kya rhgi

0 Answers  


The ratio of the number of boys and girls in a school is 3:2 Out of these 10% the boys and 25% of girls are scholarship holders. % of students who are not scholarship holders.?

0 Answers   3i Infotech, Amazon, Canara Bank, Mu Sigma,


2435/24=24?

4 Answers   HDFC, TCS,


Plz, send me last five years all questions with answers of sbi clerkship exam

0 Answers   State Bank Of India SBI,


The cycle has following specifications: The rear derailer is on the 14 tooth gear and the front derailer is on the 52 tooth gear. The rear gear has 14 teeth. The diameter of the rear wheel is 27". If a cyclist pedals at 75 revolutions per minute, then what will be the speed achieved?

0 Answers   Cap Gemini,






55*55*55+45*45*45/55*55-55*45+45*45

9 Answers   Infosys,


3 angles or 3 sides r given. Which will form a triangle?

0 Answers   TCS,


Each row of letters or numbers has a rule connecting them. Write the next number or letterin the brackets. K , A , J , B , I , C , H , (_ _ _)

0 Answers   Accenture,


which is the highest lake falls in India?

4 Answers  


Mr. Sohan works for Azania Company. The company grants 1000 shares to Mr. Sohan in 2008. At that point each share is worth Rs. 100. In 2010, he decides to sell his entire stake and at that point, the value is Rs. 120 per share. The government declares that the tax to be paid is 10% of the entire profit. Due to the inflation, the value of a rupee in 2010 is equivalent to 0.8 of a rupee in 2008. In this situation, which of the following model indicates the actual tax to be paid by the investor?

0 Answers   Cap Gemini,


Price of product is reduced by 30%. What % should be increased to make it 100 % ?

0 Answers   CMC,


Can there be a line which can cut all the four quadrants?

6 Answers   HCL,


Categories