Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z




Verifone Interview Questions
Questions Answers Views Company eMail

Product of three consecutive nos. 210. What is the sum of two least numbers?

4 9479

If the area of the sqaure is increased by 69 % how much the length of the side will increase?

1 12193

if the sum of five consecutive nos. 35? how many prime nos are there ?

5 13680

if the length of the rectangle is reduced by 20% and breath is increased by 20 % what is the net change ?

2 4313

If there are too many page faults what is the problem?

2 8600





To ensure one pgm. doesnt corrupt other pgm. in a Multi-pgm. enviornment .what you should do?

2 4323

Which one you will use to implement critical section?

1236

Which one is not needed for Multi-pgm. enviornment?

1 3028

Which one is not done by Data link layer ? bit stuffing, LRC,CRC,parity check

1 3961

int a=1,b=2,c=3; printf("%d,%d",a,b,c); What is the output?

14 19156

if length of a rectangle is incr by 20% and width is decr by 20% then area

5 20751

the lead in pencil is 5inch long.after pieces of 1/8.1-3/4,1-1/12 inches are broken how long is the lead left in the pencil?

1 3487

how many two digit numbers satisfy the property:the last digit of the sqr of the two digit number is 8

2 8742

what is the max no of points of intersection of two circles of unequal radii

7 13524

if the area of sqare increases by 69% then side of the sqr incr by

5 5280

Post New Verifone Interview Questions









Un-Answered Questions

What is api level, codename of android 4.4?

58


Why models are generated in platform extensions?

1


How do you overwrite replication factor?

3


The Tabula Manufacturing Company has been in business for one month. At the end of month the company had the following accounts: Materials used K 5 000.00 Direct labour 10 000.00 Indirect labour 3 000.00 Indirect materials 2 000.00 Labour fringe benefits 1 000.00 Supervisor’s salary 1 000.00 Depreciation Machinery 2 000.00 Miscellaneous factory overhead 1 000.00 Heat and light 500.00 Insurance on plant 1 500.00 The company processed two jobs during the month with costs as follows: Job 101 Job 102 Materials cost K3 000.00 K2 000.00 Direct labour cost K6 000.00 K4 000.00 Direct labour hours 4 000.00 3 000.00 Machine hours 2 000.00 1 000.00 The company does not use a predetermined rate for factory overhead. The rate is computed at the end of each month. Required Use both the direct labour hours and machine hours to compute: 1) The overhead rates for the month (5 pts) 2) The overhead cost for each job (5pts) 3) The total cost for each job (10 pts) 4) Briefly describe the difference between Job order and process costing, citing relevant examples (5 pts).

1103


I run a web server. Am I at risk? : java security

56






Tell me about your work experience? How has it prepared you for a career at Ross Stores?

121


Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks

959


What do you mean by having php as whitespace insensitive?

36


How to start and stop splunk service?

19


Does the system.exception class have any cool features?

73


Explain goto?

89


In android, the process technical to convert an address into its latitude and longitude is called?

62


What is struct and enum?

1


How long does it take to get good at leetcode?

44


Can we install two different peopletools version on same machine ie client, if yes , what oracle configuration should be installed?

59