Answer / chandra

The Question here is not about the Developer accepting the
defect as a defect or not.. this is about the severity and
priority of the defect not been agreed by the SE..
To answer the question....

As you all know Severity and Priority are two different
measures of a Defect...
S : Technical Measure
P : Business need.... (in other words..Users urgency)

During the kick off.. A set of rules will be defined on
assigning the severity and Priority to the defects...

Severity : 1 - Cannot work further..(technically.. system
crash.. cannot login.. application not available... etc..)
2 - A major portion of the application testing is blocked
due to a failure.. (Say you are checking a reporting tool
which will send out notification email after the report
finish running... and the notification server has issue and
no notification is sent after the report completes running)
3 - Any functional Defect.. (cannot save a record. cannot
process a calculation etc)
4 - minor UI issues or spelling mistakes etc..
5 - suggestions or nice to have things...

on the other hand priority is purely user dependent..
A user can set a priority of a spelling mistake as P1. as
it is important for him.. so SE cannot argue at this
point..

So Defects whose levels are set as per the above
calculations will hardly see a rejection from SE..

If nothing workds .. there is always a DRB or Triage group
which decides the Sev/Pri of a defect..

Hope this answers the question....

Cheers
Chandra

Is This Answer Correct ?    12 Yes 0 No

What will you do if your developer doesnt agree with you on the severity and priority that you ass..

Answer / aman

If developer does not agree , then I will firstly send the
snap shot to him for consideration of the bug.
If then also there are problem of not accepting then I will
include the senior member and architecture into this.
It will be learning Phase for me as well as the developer in
that case.

Aman
aman.testing@gmail.com

Is This Answer Correct ?    0 Yes 0 No

What will you do if your developer doesnt agree with you on the severity and priority that you ass..

Answer / prasanna raghava

We will send snap shots of the bugs to the development team
and also we will inform to our Team Lead regarding the issue
and he will take care of it.

Is This Answer Correct ?    0 Yes 1 No

What will you do if your developer doesnt agree with you on the severity and priority that you ass..

Answer / phani

Hi,
In my view,sevirity is given by TEs and priority is based
on the time to release if release date in near its high far
lowpriority respectivly.
priority is nothing but time taken to fix the bug by
adevolper based

Is This Answer Correct ?    0 Yes 1 No

What will you do if your developer doesnt agree with you on the severity and priority that you ass..

Answer / ramprasad.s

Hi

Steps & procedures with attachments will be sent to the
developer .
It may not be reprodusable at the developer end
or
The Retested build may again cause bug whild doing
regression Test.
We have send the test scenario wise to the developer.

u got it.

sun_ramprasad@yahoo.com

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Manual Testing Interview Questions

What is verification & validation ? What we do in verificaztion & validation? Give an example.

2 Answers  


What are release notes and what it contents?

2 Answers   PCS, TATA,


If you have executed 100 test cases ,every test case passed but apart from these testcase you found some defect for which testcase is not prepared,thwn how you can report the bug?

4 Answers   Four soft,


Q-1) You are running out of time but you have to test the software what will be your approach? Q-2) The largest cost of quality is from production failure.true or false Q-3)Defects are lest costly to correct at what stage of development cycle? Q-4) what is that tester complain usually?

4 Answers  


Process and procedures followed while writing Integration testcases and system test cases

1 Answers   CSC,






What is Intersystem testing

5 Answers   IBM,


what is bug life cycle? (Asked in Zensar Hyderabad today(17-1-12010))

5 Answers   Zensar,


What kind of testing to be done in client server application and web application? Explain

0 Answers  


write test case for linked in sign up page ?

0 Answers  


This question has been asked in my recent inerview with Adithya Birla Group.When to prepare System test plan after getting build or before getting build?

1 Answers   Aditya Birla,


What is Traceability Matrix? How will you exactly map it and in which stage will you prepare that?

1 Answers   IBM,


What is meant by code walkthrough?

5 Answers  


Categories