What is the major risk or challenge faced by you as QA
analyst other than clash with the developer regarding the
defect log.
Answer / tester24
To check out the project when it was not completed and the
despatch date is on door.
Regards
Jaglan
| Is This Answer Correct ? | 1 Yes | 1 No |
What is variable trace?
Explain metric?
Test report?
I am having 1.5 years of exp. in Manual testing.What I have to do now? Should I do ISTQB Certification or Perl/Shell Scripting Languages? OR Anything else.Please Guide me properly.
What is called the process starting with the terminal modules?
Whether networking knowledge is essential for a testing professional?
In the 7 Stages of the SDLC (Planning, System Analysis, System Design, Development, Testing, Implementation, and Maintenance), WHO are the stakeholders of each stage?
How will you conduct risk analysis?
At what phase tester role starts?
What is the information that should be covered in test plan?
Explain unit testing?
I am planning to write a ISTQB Certification exam , i don't know about EXAM fee structures , please tell me the fee structure ? mail id: karthitkd.123@gmail.com