differentiate defect age & build version control?
Answers were Sorted based on User's Feedback
Answer / aatish jawalkar
defect age:It is the time gap between resolved on and
reported on.
Build interval period: It is time gap between product
delivered to testing team by development team.
Is This Answer Correct ? | 2 Yes | 1 No |
if there are 10 step in test cases while executing if their is mismatch at step 5 what is status of test case ? pass or fail or anything else? if require tab is not available then what's the status of test case?
what are the key components of test plan document?
What is the difference between EXPLORATORY TESTING and ADHOC TESTING?
An engineering college wants to automate their examination activities to speed up their work and maintain high-end accuracy of information. A brief overview of the proposed system is given below: The proposed examination system is consisting of 8 semesters spread across 9 branches (assume your own branch names) and spans over a period of 4 years. Each student belongs to a branch and must register for a minimum of 6 courses but not exceed 8 courses maximum. The scoring pattern for each course is given as below: Maximum marks for each course: 100 Pass: 35% Distinction: 70% and above First class: =>60% and <70% Second class: >50% and <60% Pass Class: >=35% and <50% The proposed system computes the result and announces the results every semester. The results must be accurate and all examination records will be maintained till the students leave the college. Develop a Test Strategy to test the proposed system. Your Test Strategy must include the following: • Test Plan • Testing Methodology to be followed • Test cases • Test effort estimation • Test Correction Mechanism Note: If you need more information on the requirement specification, you are permitted to assume along the same line but clearly specify the details.
What is Test idea? format of test idea
what are the fields in Bug Report
can we test the product with out documents?
what is the velue of, 'x'?
Does any one have Performance test plan and Security test plan? Please help me as i need it ASAP... Thanks in Advance.
After asking the defect life cycle, if you think it is not a valid defect, what you will do, whether you will store in any document for future reviews,if yes, what is that document, where you will save that document? or just reject it and close it?
what type of testing process is going on your company?
8 Answers Accenture, CTS, ISPG, Ordain Solutions,
what is your company testcase format?
18 Answers Infosys, MasterMind, Sinsoft,