Answer / shiva
defect means while using the application the enduser get
any discrepency now this is called as defect.
Error - It can at developer stage at writing the code
Bug- While testing the application the tester will find out
the bugs (Means expected and actual values are not match)
| Is This Answer Correct ? | 1 Yes | 3 No |
Answer / v
Error:Deviation from expected output and obtained output.
Bug:Tester getting any dicrepancy called is bug
Defect:user is getting any discrepacy callled as defect.
Fault:Fault is a condition on that not meeitng the spec
| Is This Answer Correct ? | 2 Yes | 6 No |
Answer / anbarasan
error-mistake made by programmer
defect-mistake found by tester
fault-mistake found by client during the warranty period
bug-mistake found after the warranty period n couldnt be
rectified
correct me if i m wrong
| Is This Answer Correct ? | 6 Yes | 11 No |
Answer / sangita tiwari
software that can cause the component or system to fail
to perform its required function
| Is This Answer Correct ? | 0 Yes | 5 No |
Answer / murali
Error : Human action that produces an incorrect result
called Error (devoloper mistakes called Error).
Fault : Fault is a state of software, caused by Error.
Failure : Failure is an event, that has been done by Fault.
Bug : Tester mistake in finding Error,called Bug.
| Is This Answer Correct ? | 4 Yes | 10 No |
hi guys...every test engineer have strong knowledge on SQL....but i have zero knowledge on sql......pls suggest me which one i need.. to get strong knoledge on sql .... learn SQL SERVER or ORACLE?
specify another matrix/table used for same functionality as of tracibility matrix?
What do you plan to become after say 2-5yrs (Ex: QA Manager, Why?)
What Questions Project Manager will be aske?
what is severity and priority?
7 Answers Product Dossier, Tarang,
Explain the ISO ( more information about the ISO)
What is Migration testing?
hi friends .......... from srs to signoff what r the tests the testing team will conduct either sequentially or parallel pls advice thanks in advance
What are the Testers Responsbile?
What is meant code review?
Please give me any example of High severity and Low priority type of bug ?
how many modules in ur bank project? what functionalities r there?how did u check? could u plz expalin ur banking project?