what are the risk factors in the project? what is the base
for testplan and entry criteria ,exit criteria for test plan?
Answer / gomathi baluswamy
The base for test plan is the Functional Specification
Document.Once you have the FSD then you start creating test
plan.
For entry criteria following are the base:
FSD is ready
Build is ready
Test cases are ready
For exit criteria following are the base:
All functions present in FSD are present in the product and
all functions are working.
All planned test cases are executed.
Is This Answer Correct ? | 2 Yes | 0 No |
How to Trace a Defect?
wat if fiddler and how it is used in tesing an application. please explain with a real time scenario
3.what are two of your strengths that will bring to QA/testing team?
How to test for improper links or broken links and would be there impact on the system?
Generally which testing methodology we follow in software organizations. thanx in adv
Please explain test matrices
What is the value of a testing group? How do you justify your work and budget?
what is the difference between HLD(high level design)and LLD(low level design)?
What is the term ‘quality’ mean when testing?
hi, this is an interview question."what are the testing skills that u have ?". how can i answer to this one ? reply me correct answer plzzzzzzz
you have 200 testcase there is no enough time to excute all the testcase but you have to released that build.what can u do it?
Explain the various steps to conduct Requirements Elicitation process