which model are you following
Answers were Sorted based on User's Feedback
Answer / prasad
Its depends on the comany and the project.
Suppose the requirements are keep on changing or the client
doesnt have the clear idea about what exactly he wants then
we can go for PROTOTYPE MODEL.
Most of the standard oprganizations go for V model.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / anil
It will depend on the project. Most of the development will
done in waterfall model.
| Is This Answer Correct ? | 1 Yes | 0 No |
What is the main difference between SDLC & V-MODEL. In the interview,wht exact difference,i should tell for an interveiwer
6 Answers Accenture, kenexa, TCS,
some major negative test cases to break the sign up page having username password, email, url address field and some check box selection options ?
is it necessary to write neagtive test cases for each and every field
WAT VSS ?HOW CAN WE USE IT?
what is confrigation management, and change managment?
Training for Manual/QTP Testing from 6 years MNC experience engineer, working in Patni with Project .Guranteed Job training else fee back in Mumbai-mail-- >amol.dhumalatrediffmail dot com
How can u know IP Address of a computer?
how will you test a wine filled bottle along with 100 glasses
Is it Mandatory to use "ECP" & "BVA" Techniques for "LOGIN" Page???,Can any one tell me the correct answer ?,If Yes then why?
what is the difference between quality control and quality assurance?
plz tell me the difference b/w PB/MF based appl.with examples. Thanks
what is traceability matrix ?what is use of that matix ?