What development model should programmers and the test group
use?
Answer / gomathi baluswamy
The programmers and test group should use V-V Model
(Verification-Validation ) in the Software Development Life
Cycle.
Is This Answer Correct ? | 1 Yes | 0 No |
can u write some high level scenarios on ms outlook express
What is PBX Testing & What is Test coverage?
Briefly explain what is Quality Assurance life cycle?
what is the preference when we perform manual testing- either FEATURES or FUNCTIONALITY ?
When should you begin testing?
can anyone give me a good example for creating Bug report with all its mandatory field
What are the steps, procedures, objectives to write test cases.
What is difference between Manual testing and Pega/BPM testing?
Neelima, Can you please brief what are the 15 testing issues. I'm aware of 5 Software developement life cycle.
I am a B.COM graduate. I have studied all the theorotical aspects of manual testing. How can i get in to testing without practical exp. And even if i manage to get a job, i want to know whether i will be able to do my job, being i am new to software field.
What is the common bug u face in a web-based application. .?
Difference between smoke and sanity testing