Should we test every possible combination/scenario for a
program?
Answer / sujitha
Its not mandatory.There are several points to be considered here. Delivery time available, personnel availability, complexity of the application under testing, available resources, budget etc. But we should cover the testing to the maximum extent satisfying the primary functionalities which are must from the customer
point of view.
| Is This Answer Correct ? | 0 Yes | 0 No |
What is mean by Schedule report who is the responsible for generated that one ?
How can we explain about matrics..Every time iam getting this question..Have you involved in metrics??..Plz..plz Can any anybody give the sugessions..What is the best way to explain about metrics..give me your valuble answer..thanks in advance...
What are the prototypes are used during the integration testing ?Explain the stub and the driver in details?Are the stub and the driver both are used in top-down and the bottom-up approaches ?
If a test script instructs WinRunner to open an application to test it, what end conditions might be good?
if tester invloves in req or initial phase , what test eng will do in initial phase?
What is the negative testing and example
what s test block ratio? please any one answer me..
How was the regression testing done in your project what was the contribution of the regression test effort for the whole quality improvement?
What is Risk analysis? Explain with example
what is the difference b/n DPD(Defect profile document) and TRD(Test Report document).
Fault-based testing is best reserved for Option 1 Conventional software testing Option 2 Operations and classes that are critical or suspect Option 3 Use-case validation Option 4 White-box testing of operator algorithms
what is volume Testing?