A contractor employed 200 men to complete a strip of highway in 200 days. After 150 days he found that only 3/5th of the strip is complete. How many additional men should be employed to complete the work on time?
No Answer is Posted For this Question
Be the First to Post Answer
who is frist chief commissioner of income tax in india
The largest rubber producer in the world__________
What kind of salary of State Bank Of India Employee add total?
i want epf model paper.please send me
please let me know the minimum qualifying marks in screening test of group1 2010 to be eligible for group1 main exam.
sir plz provide FACTSET written test (finance)based papers with answers
1 Answers FactSet Systems, ICICI,
In a well of 20feet depth, a frog jumps 5feet up in the morning and comes 4feet down in the evening, on which day the frog gets out of the well.
the minimum of (2x+1)**2 + (x+2) is at x =
a person went to a shop and asked for change for 1.15paise. but he said that he could not only give change for one rupee. but also for 50p,25p,10p and 5p. what were the coins he had
if c is a positive number,500% of c is what % of 500c
a person left house with speed 40 mile per hour. His wife after 30 minutes left to catch him at a speed of 50 Miles Per Hour. in what time she will catch.
Grace has 16 jellybeans in her pocket. She has 8 red ones, 4 green ones, and 4 blue ones. What is the minimum number of jellybeans she must take out of her pocket to ensure that she has one of each color