A can have a piece of work done in 8 days, B can work three times faster than the A, C can work five times faster than A. How many days will they take to do the work together ?
No Answer is Posted For this Question
Be the First to Post Answer
A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.
The major component of CNG is a. Ethane b. Propane c. Butane d. Methane
In a mixture R is two parts, S is one part . In order to mixture how much R is to be added.
If a triangle has a base B and the altitude of the triangle is twice the base, then the area of the triangle is
There are 19 red balls and one black ball . Ten balls are put in one jar and the remaining 10 are put in another jar. what is the possibility that the black in the right jar.
2 oranges,3 bananas and 4 apples cost Rs.15 . 3 oranges 2 bananas 1 apple costs Rs 10. what is the cost of 3 oranges, 3 bananas and 3 apples ANs Rs 15.
if a man byes 1 lt of milk for 12 rs and mixes with 20% of water and sels it for rs 15 thgen what is percentage of gain
I want sbi clerk exame question bank
1/(10 power 18) - 1/(10 power 20) = ?
7 Answers iGate, Mascot, TCS, Wipro,
The cost of four dozen proof machine ribbons and five dozen accouting machine ribbons was Rs.160/-. If one dozen accounting machine ribbons cost Rs.20/-, what is the cost of a dozen proof machine ribbons?
3,3,5,4,4,-,-,5,4,3, find the blanks of given series
Find the correct meaning of the following phrase: To bite the dust