Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


A contract is to paint 3 houses. Mr brown takes 6 days to
paint a house. Mr black takes 8 days and Mr blue 12 days. Mr
brown leaves for a vacation after 8 days. Mr black works for
6 days from then.How many days would Mr blue require to
complete the contract?

Answers were Sorted based on User's Feedback



A contract is to paint 3 houses. Mr brown takes 6 days to paint a house. Mr black takes 8 days and ..

Answer / m.vinod

11 days
brown completes 1+1/3 house in 8 days
black completes 3/4 house in 6 days
let the work done by blue=x
then
1+1/3+3/4+x=3 total houses to paint
x=11/12
so blue will complete the remaining work in 11 days

Is This Answer Correct ?    9 Yes 0 No

A contract is to paint 3 houses. Mr brown takes 6 days to paint a house. Mr black takes 8 days and ..

Answer / muthuvel

2 days

Is This Answer Correct ?    2 Yes 1 No

A contract is to paint 3 houses. Mr brown takes 6 days to paint a house. Mr black takes 8 days and ..

Answer / scrappy-coco

a tiny bit of modification in the first answer.
Mr. Brown completes 4/3 rd of a house
Mr. Black completes 3/4 th of a house
Mr. Blue completes x/12 th of a house
It is evident that 4/3+3/4+x/12=3
i.e. (x+25)/12=3
i.e. x=11
So Mr. Blue takes 11 days

Is This Answer Correct ?    0 Yes 0 No

A contract is to paint 3 houses. Mr brown takes 6 days to paint a house. Mr black takes 8 days and ..

Answer / gayatri

4 days

Is This Answer Correct ?    0 Yes 1 No

A contract is to paint 3 houses. Mr brown takes 6 days to paint a house. Mr black takes 8 days and ..

Answer / raj

I think it is 12.
Mr brown completes 1 house + 1/4 th a house in 8 days.
Mr black completes 3/4 th a house in 6 days. 1/4 +3/4 = 1
thus one more house left to be painted. Mr blue takes 12
days to paint 1 house( given in the question ).

Is This Answer Correct ?    0 Yes 3 No

Post New Answer

More General Aptitude Interview Questions

For 1:2:4 ratios the weight of cement is 50 kg then how many kg are the weight of sand and aggregate?

0 Answers   Reliance,


2 hours after a freight train leaves Delhi a passenger train leaves the same station travelling in the same direction at an average speed of 16 km/hr. After travelling 4 hrs the passenger train overtakes the freight train. The average speed of the freight train was?

8 Answers   Infosys, Tejas,


19.) When two unbiased dice are tossed simultaneously, the numbers that appear on the top surface of the two dice are a and b.What is the probability that a^b is a perfect square? (a^b=a to the power of b) a)1/3 b)2/3 c)23/36 d)11/18 ans: 20.) When two unbiased dice are tossed simultaneously, the numbers that appear on the top surface of the two dice are a and b.What is the probability that (a × b) is a perfect square? a)5/36 b) 2/9 c) 7/36 d) 1/6

3 Answers  


15 tennis players take part in a tournament. Every player plays twice with each of his opponents. How many games are to be played?

0 Answers   HCL, Infosys,


When two unbiased dice are tossed simultaneously, the numbers that appear on the top surface of the two dice are a and b.What is the probability that a^b is a perfect square? (a^b=a to the power of b)

4 Answers   TCS,


A person runs 6 ft in 1/4 sec. how much it will run in 10 sec. ans 240

0 Answers   Accenture,


If a refrigerator contains 12 cans such that 7 blue cans and 5 red cans. In how many ways can we remove 8 cans so that atleast 1 blue can and 1 red can remains in the refrigerator?

0 Answers   HCL, Infosys,


A, B ans C are three speakers. They have to speak randomly along with another 5 speakers in a function. A has to speak before B and B has to speak before C. What is the probability.

0 Answers   Flipkart,


in the human body cowpers glands form a part of which one of the following

3 Answers   CDS,


Why RSD of area limit is 15?

0 Answers   Altisource, UPL,


what is the difference between deviation & change control? what is trouble shooting?

1 Answers   Zydus Cadila,


5) Write a program that takes a 3 digit number n and finds out whether the number 2^n + 1 is prime, or if it is not prime find out its factors.

0 Answers  


Categories