A can do a piece of work in 20 days, which B can do in 12 days. In 9 days B does ¾ of the work. How many days will A take to finish the remaining work?
No Answer is Posted For this Question
Be the First to Post Answer
What is difference between public sector bank and government bank?
please send me last ten year sample paper of clerkical of satate bank of india
0 Answers State Bank Of India SBI,
There are 9 coins. One of 9 is less weighted and others have equal weighed. Find the minimum no of balances to find the defective coin?
In 29 words or fewer, describe what you would strive to accomplish if you worked at Google Labs.
3 Answers Google, Patni, Wipro,
The sum of four natural numbers a1, a2, a3 and a4 is 210. What is the minimum possible LCM of these 4 mentioned natural numbers?
There are five thieves, each loot a bakery one after the other such that the first one takes 1/2 of the total no. of the breads plus 1/2 of a bread. Similarly 2nd, 3rd,4th and 5th also did the same. After the fifth one no. of breads remained are 3. Initially how many breads were there?
I am in need of probationary officers Exam model question papers.
there are 3 door in a closed room.Behind two door there is beast and behind one is a beauty. and you know that one of the door which contain beast.Now find the maximum chance of you win ie getting the beauty.
Please send the SBI model question paper.
3 Answers State Bank Of India SBI,
Choose the odd man out from the below mentioned options?
window was introduse in
What is the least number of squares marbles required to pave the floor of a room 15 m 17 cm long and 9 m 2 cm broad?