Hello
My name is vijay right now I'm preparing for SBI po, I am good at aptitude but not better. I am lagging time you know competitive exams are to answer in span of time. So any website regarding aptitude short cuts or tricks
Pls post to my mail. I am waiting
No Answer is Posted For this Question
Be the First to Post Answer
make 4 using 1,1,6,7 operators +,-,x,/ are allowed numbers are not to be repeted
The mean and the variance of a binomial distribution are 4 and 2 respectively. Then the probability of 2 successes is?
Could anyone please email the answers to the verizon 2014 aptitude test
You are in a boat with ur mother and father . You got that the boat is getting in the water then to whom u will save firstly ur mother or ur father ? Why or why not?
22 Answers Apollo, Indian Army, Patni, SSB,
Name of the cipla medicine product
The walls and roof of a room are 10 m long,8 m wide and 10 m in height is to be painted.How much will it cost at Rs.5 per sq.foot? A.1600 B.2000 C.2200 D.2400
10 Answers Cap Gemini, College School Exams Tests, GE, IS, ISRO, TCS,
A certain number of men can finish a piece of work in 10 days. If however there were 10 men less it will take 10 days more for the work to be finished. How many men were there originally?
There is a certain four digit number whose fourth digit is twise the first digit. Third digit is three more than second digit. Sum of the first and fourth digits twise the third number. What was that number ?
A train overtakes two persons walking along a railway track. The first one walks at 4.5 km.hr . the other one walks at 5.4 km/hr. the train needs 8.4 and 8.5 seconds respectively to overtake them, What is the speed of the train if both the persons are walking in the same direction as the train?
A clock is late by 1 minute 27 seconds in a month. Then how much will it be late in 1 day?
0 Answers BPCL Bharat Petroleum, Sonata,
Find the missing number in this series? 8 2 14 6 11 ? 14 6 18 12
A company installed 36 machines at the beginning of the year. In March they installed 9 additional machines and then disconnected 18 in August. How many were still installed at the end of the year.